Energy

Photovoltaic parks

  • Improving efficiency – inspection with thermal camera
  • Fast inspection to provide decision for problem elimination

Wind turbine parks

  • Improving efficiency
  • Short period of inspection – up to 2 hours per installation instead of half a day
  • Fast and precise gathering of information to provide right repair data input
  • Decreased risk of incidents, warranty about human factor’s safety

Power lines

  • Inspection with a thermal camera for bad connections without switch off  of the equipment
  • Fast evaluation of the equipment status
  • Effective decision – accuracy and fastness
  • The heavy equipment on the right place